Sunday, November 16, 2008

My Sheetrock problem

Sheetrock arrived. Two guys put it all up, except two bedrooms, in one day. I watched with my jaw dropped. While they did that I put durarock up in one and a half bathrooms. I felt so little.
The mystery chimney. He had this covered up on the inside and outside. No idea why and I don't want to know. If we stay in the house long enough, maybe we'll have a chimney expert come look at it and see if it's worth opening up the can of worms.
We had to rip down 60% of the sheetrock in the home so that all the electrical could be checked and a few things fixed. Not fun! This is the wall on the right in the kitchen. It's where the panel is located on the outside.

No comments: