Sunday, July 27, 2008

Downstairs bathroom...

After the inspector passes it off we're ready to pour cement and tile. I've really enjoyed this since it's completely different from what was already in there. The hole in the upper right hand corner is from the plumber. When he filled up the drain pipe, water sprayed everywhere. Turns out he never connected the two pipes in the ceiling. Plumbing is roughed in now. We have water!!!

1 comment:

AJordan said...

dad was just doing this same exact thing in their downstairs bathroom. it looks so good now. you should get them to post some good pics of their project. it looks really good down there. sad you had to tear out all the tile. how are things going?